CASE STUDY / HOTEL AND SPORT CENTRE ARLAMOW

Hotel & wellness

With more than 200 chillers installed, totalling 140 MW of cooling energy, our group has solid experience in the field of energy efficiency.

Century AR-D300L2

CHILLER FED BY BIOMASS PROCESS

Supply of absorption chillers for biomass CCHP plant for Polish resort

We supplied two Century chillers (AR-D300L2 with 1,350 kW for a single unit) for the biomass trigeneration plant of the Arlamow Hotel in Poland. The two absorbers are fed with hot water (95°C) generated by the biomass boiler producing a total of 2700 kW cold for air conditioning.